Lifecycle of an operation
The main stages of an operation are structured as follows:
- Choice of country and feasibility study.
- Collection of computers that are no longer in use.
- Preparation, formatting, and installation of open-source software on these PCs (Linux system, LibreOffice word processing, Gcompris educational software, etc.). Partnership with Humanis.
- Organization of transport from Strasbourg to the destination site.
- Participation in on-site installation and implementation of both theoretical and practical training for the use of the equipment.
Types of PCs sent
In 2010 (Tadjikistan) Ordinateur de type pentium IV Mémoire 512 Mo Disque dur 40 Go Écran plat 15 pouces Clavier – souris, Prise Réseau, USB Lecteur de CD-ROM/DVD-ROM |
In 2014 (Cienfuegos – Cuba) Ordinateur de type pentium IV – 2.9 Ghz Mémoire 1 Go Disque dur 80 Go Écran plat 17 pouces Clavier – souris, Prise Réseau, USB Lecteur DVD |

History of our projects
- 2024 : Tananarive (Madagascar)
- 2022 : Lomé (Togo)
- 2019 : Sainte-Marie (Madagascar)
- 2018 : Village Ban fang deng (Laos)
- 2017 : Ouagadougou (Burina Faso)
- 2016 : Village Ban fang deng (Laos)
- 2015 : Ouagadougou (Burina Faso)
- 2014 : Cienfuegos (Cuba)
- 2013 : Ouagadougou (Burkina Faso)
- 2012 : Cienfuegos (Cuba)
- 2010 : Centre d’enfants des rues à Douchanbé et Orphelina à Farhor (Tajikistan)
- 2019 : Sidi Kacem (Maroc)
- 2008 : N’damena (Tchad)
